Here we have compiled the most frequently asked questions from clients before cooperation.
Covering MOQ, sampling, OEM / ODM, fabric selection, pricing, production lead time, quality control, packaging and shipping, these FAQs will help you quickly understand our cooperation terms and manufacturing workflow.
If you cannot find answers to your questions here, please feel free to contact us anytime.
What is the minimum order quantity (MOQ) for ODM and OEM orders?
MOQ depends on the style, fabric, and complexity of the manufacturing process.
General guidelines:
· ODM existing styles: Minimum order of 1 piece
· OEM customized styles: Minimum order of 100 pieces/style
· Supports multiple sizes and color combinations
For start-up brands and small to medium-sized wholesalers, we can also provide flexible solutions based on project requirements.
What information is required to start an OEM project?
For a quick and accurate quote, we recommend providing:
· Product images or design drawings
· Tech Pack
· Fabric requirements
· Size chart
· Logo file
· Estimated order quantity
· Packaging requirements The more complete the information, the more accurate the quote and the higher the development efficiency.
Can you help develop samples if I only have pictures?
Yes.
Our development team can develop samples based on:
· Product images
· Physical sample garments
· Hand-drawn sketches
· Technical drawings
· Brand requirements
and provide suggestions for fabric and process optimization.
What is a Tech Pack? Why is it important?
A Tech Pack is an important document for garment production, typically containing:
· Size specifications
· Fabric information
· Color requirements
· Process specifications
· Logo placement
· Packaging requirements
A complete Tech Pack can:
· Reduce communication errors
· Improve sampling efficiency
· Ensure consistent mass production quality
· Shorten the development cycle
How long does sampling typically take?
Standard sampling cycle:
Project Time
Existing style modification 1-3 days
OEM new style development 3-7 days
Complex process styles 7-15 days Rush projects can be prioritized.
How long is the mass production cycle?
It depends on the order quantity and fabric availability.
Standard Production Cycle:
· Fabric Procurement: 1-5 days
· Cutting and Production: 10-30 days
· Quality Inspection and Packaging: 3-5 days
Overall Production Cycle is typically:
15-40 days
(Calculated from sample confirmation)
Do you support fabric customization?
Yes.
We can develop the following according to customer needs:
· Dyeing
· Printing
· Digital Printing
· Embroidery
· Hot Stamping
· Puff Embroidery
· Puff Pastry
· Hot Stamping
· Washing Process
· Special Functional Fabrics
Meeting brand personalization needs
Can you customize hangtags and packaging?
Yes.
Supported:
Hang Tags
• Coated Paper Hang Tags
• Specialty Paper Hang Tags
• Kraft Paper Hang Tags
• Hot Stamping Hang Tags
• Silver Stamping Hang Tags
Neck Labels
• Woven Labels
• Printed Labels
• Heat Transfer Labels
Packaging
• PE Bags
• PP Bags
• Frosted Zipper Bags
• Self-Sealing Bags
• Non-woven Packaging Bags
• Gift Box Packaging
All can be printed with customer brand logos.
How do you guarantee product quality?
We implement a strict quality control process:
1. Fabric Inspection
Checking color difference, weight, shrinkage rate, etc.
2. Pre-production Confirmation
Confirming samples and process standards
3. Production Inspection
Real-time monitoring of the production process
4. Finished Product Inspection
Checking dimensions, processes, and packaging
5. Packing Inspection
Ensuring correct quantity and packaging
6. Outbound Re-inspection
Final confirmation before shipment